Skip to Content
Important Notice ahead of OBOS Mandatory Pre-Proposal Meeting December 18, 2024 READ MORE
Important Notice ahead of OBOS Mandatory Pre-Proposal Meeting December 18, 2024 READ MORE
Back news-img

Overnight Bridge Maintenance on Selmon Expressway West Extension

Tampa, FL (August 14, 2024) – The Tampa Hillsborough Expressway Authority (THEA) will be performing bridge maintenance at the Selmon West Extension bridge over Gandy Boulevard. The work will be performed between the hours of 8:00 PM and 6:00 AM starting on Friday, August 16th and will be completed by Tuesday, August 20th.

Crews will be using the median on Gandy Boulevard to transport materials into the bridge with most of the work being performed inside the structure. Out of an abundance of caution, the crews will perform up to three rolling closures per night with a safety vehicle blocking traffic from traveling on and under the bridge  for up to fifteen minutes at a time.

Key Details:

  • Dates: Evenings of August 16, 2024 – August 20, 2024
  • Timing: Between 8:00 PM and 6:00 AM
  • Location: Minimal nightly 15-minute rolling closures between Gandy Boulevard near Manhattan Avenue

 

THEA is dedicated to ensuring the safety and efficiency of the expressway system in Tampa. Our ongoing projects aim to improve traffic flow and safety for all motorists.

For more information, please contact Keisha Pickett Boyd at (813) 272-6740 Ext. 211 or [email protected].

subscribe

Top Button